Client / LocationProject & Scope of WorksNature of Work
Etuba – Orapa MineElectrical design, installation & commissioning of a new Vacuum Air Cleaning Unit (Dec 2020)Design & Construction
Hytec – Orapa MineElectrical & instrumentation installation for Crusher Oil Lubrication System (Oct 2020)JV Construction
Lucara MineProcess weightometer calibration, alignment & loadcell replacement (Oct 2020)Maintenance
Debswana – Orapa No. 2PCSU Project supervision: installation of new RIO stations, racks, cables, testing (Sept 2020)Project Supervision
Mupane Gold MineDecommissioning, installation & calibration of belt scales (2018–2020)Maintenance
Debswana – Orapa No.1A&I refurbishment; relocation of conveyors; HT jointing & installation of 2MVA transformerConstruction
Morupule A Power StationCalibration of weightometers & coal hopper measurement systems (2017)Maintenance
Letlhakane Tailings DumpUpgraded from multimode fiber network to wireless system with embedded redundancySystem Upgrade
Orapa Plant 2Gap measurement system upgraded from Selsyn to reliable GY Sensor SystemInstrumentation Upgrade
Orapa Plant 2I/O upgrade from Siemens ET200B to ET200SP on Paste Thickener & Primary Crusher No. 3Control System Upgrade
Zimchem RefinersDesigned & installed interfaces to migrate standalone controllers to Delta V DCSSystems Integration
Windmill Pvt LtdInstalled & commissioned automated fertilizer bagging machineAutomation Installation
Mupane Gold MineInstalled new Process Automation 4 Idler Conveyor Belt ScaleProcess Automation
Orapa Plant 2Automated 2-Way Splitter Bin Hydraulic Power PackAutomation Upgrade